Laserfiche WebLink
�rt . <br /> rr <br /> College Park at Mountain House Specific Plan M. <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> fmplementation&Verification <br /> g' {Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> Q biologist and DFG determine it would not be <br /> likely to adversely affect the nesting pair.DFG <br /> t 0 shall also be consulted to determine if it is <br /> 79 <br /> a necessary to temporarily preserve foraging <br /> cn habitat(in addition to the buffer area)until the <br /> nest is no longer active, <br /> < If feasible, 250-foot buffer areas shall also be <br /> v established around all other occupied burrows.If <br /> 3 <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary. Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> co alternative burrows outside the impact area, or <br /> capture and movement of owls to specific <br /> mitigation sites. <br /> Before construction SJCO.G,in <br /> o Other Nesting Raptors <br /> cn < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> {D nesting season(February,15 to August 31),pre- conducted 2 weeks <br /> construction surveys shall be conducted by a prior to construction <br /> R qualified biologist in areas of suitable-nesting activities) <br /> habitat within 500 feet of project activity.. Surveys <br /> ° shall be conducted within 2 weeks before the <br /> c <br /> beginning of construction or tree removal.If no <br /> active nests are found,no further mitigation shall <br /> cbe required. <br /> Q3 Lo ro < If active nests are found,impacts shall be avoided <br /> o to by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer' <br /> a n area until a qualified biologist'conf`i ms that the <br /> -o nest is no longer active.DFG guidelines <br /> recommend implementation of 500-foot buffers, <br /> -t = but the size of the buffer may be adjusted if a <br /> ^-...., r---- r.�� ....�, ..d.r rw...� �� t•iww �+�r*� �rrrR Irrr� �� IN�'�1 �w�w� �rr�""� """"`* """'w� <br />