Laserfiche WebLink
m o <br /> 4 <br /> College Park at Mountain House Specific Pian III <br /> _. Mitigation Monitoring and Reporting Program <br /> Imp lamentation&.Veri.fcation. <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> v Completed <br /> qualified biologist and DFG deterriune it would <br /> o not be likely to adversely affect the nest. <br /> N Monitoring of the nest by a qualified biologist <br /> cD may be required if the activity has potential <br /> adversely affect the nest, <br /> CD <br /> nSan Joaquin Kit Fox Before construction SJCOG,in <br /> < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than'14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas,,Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> K Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> o Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> O letter report documenting the survey methodology <br /> o' and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> o construction activity, and no further mitigation <br /> shall be necessary.. <br /> 0 < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> .4 determine its current use.If no activity is observe <br /> M during this period, the den shall be destroyed <br /> immediately to preclude subsequent use.If kit fox <br /> activity is observed, the den shall'be monitored fo <br />