Laserfiche WebLink
cn C3 <br /> v o <br /> @ College Park at Mountain House Specific Pian III <br /> ta W Mitigation Monitoring and Re' olrting Program <br /> o Mitigation Measure Timing/Schedule Implementation fmplemen.tafion.&Verification <br /> { Responsibility Action Date <br /> � With-Project Conditions on Anticipated Network Completed <br /> o For consistency with previously adopted roadway <br /> N standards, the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east of Grant <br /> Cn <br /> Line.Road. <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> to implementation of Mountain House Master Plan <br /> (MHMP)1IR mitigation measure 4.12-5(e) to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality--Generation of Temporary,Short- Before construction STVAPCD, in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> v The latest version of the San Joaquin Valley Air <br /> s Pollution Control District(SJVAPCD)control <br /> o measures are included in the Guide for Assessing and <br /> Uitigating.4ir Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory Setting"subsection..The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> the SJVAPCD to implement the current version of the <br /> bmeasures at the time individual development <br /> applications are received by the County for <br /> development under College Park, <br /> ro m 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction. SJVAPCD,in <br /> 0 Contaminants(TACs) begins and during conjunction with-the <br /> g0- Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1.. <br />