Laserfiche WebLink
Mm <br /> v College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o. Mitigation Measure Timing/Schedule implementation <br /> Responsibifity Action Dale <br /> Completed <br /> Q <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> CD uses shall coordinate with the SJVA.PCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> methodologies that may become available to <br /> co estimate the risk.The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality---Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with-the <br /> The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse,piles are removed. <br /> 4.12-5 Air Quality---Increased Long-Term Regional Before construction SJVAPCD,in <br /> -ry Emissions of Criteria Pollutants begins and during conjunction with-the <br /> 6S The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> M Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> are already included in the proposed prosect design <br /> and/or are already required by the MHMP and by <br /> cmitigation in the MHMP and Delta College EMS. <br /> Cl, <br /> o .D <br /> v � <br /> c � <br /> $"OWN% <br />