Laserfiche WebLink
College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility, Action. <br /> Completed <br /> Q 4,13-4 Noise—Compatibility of Proposed Land Uses After construction SdCCDD,in <br /> exceeding Predicted Noise Levels conjunction with the. <br /> `° The College Park developers shall implement the developer; in . <br /> following measures: consultation with a <br /> CM < Traffic Noise--Arterials.Before occupancy of qualified acoustical <br /> -n the first residence proposed under the College consultant <br /> 0 <br /> Park project along each of the seven arterial <br /> 3 segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof.The exact location, <br /> awy height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> m below 65 dBA L&,/CNEL and as close to 60 dBA <br /> `CD Ld,/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> 0 <br /> c <br /> s <br /> w <br /> z <br /> CO <br /> N N <br /> M CD <br /> O � <br /> � A <br /> � n <br /> C7 77 <br /> b N <br /> a _ <br /> -•c <br /> ln� ;"moot "Mn .^Y <br /> L, <br />