Laserfiche WebLink
cn n <br /> m o <br /> c- CD <br /> 2 C College Park at Mountain Mouse Specific Pian III <br /> _. Mitigation Monitoring and Reporting Program <br /> cImplementation&Verification <br /> K <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> v Compieted <br /> �� land uses, the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> least noise-sensitive periods of the day,between <br /> C the hours of 7:00 a.m. and 10:00 p.m. <br /> 0 40. .I3-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> 01 The project applicants shall implement the measures conjunction with the <br /> identified below, developer <br /> < Before occupancy of the first residence at <br /> College Park, a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> w Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the EIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm,or combination thereof.The <br /> exact location,height,and character of the noise <br /> barrier shall be determined by a noise consultant <br /> approved by the County. The sound barrier shall <br /> 5' reduce outdoor noise levels at the center of the <br /> front yards of the five existing residences to <br /> 0 <br /> below 65 dBA Ldn/CNEL.If Grant Line Road is <br /> o' widened at this location subsequent to <br /> construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> Plan II;the sound barrier shall be relocated,as <br /> required,If the five existing residences are <br /> removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> �n oimplementation.This mitigation shall be funded <br /> > through fair-share payments by the College Park <br /> developers. <br />