Laserfiche WebLink
F__ r- r-_ r r- r- r <br /> Cl) 0 <br /> N p <br /> e CD <br /> o°, m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> a g Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Date <br /> j Responsibility Action Completed <br /> �• 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin Cou7the <br /> mLand Uses construction,and Community <br /> � The College Park developers shall implement the During design phase Development <br /> ID following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> Irrigation District(BBID)canals from proposed conjunction with <br /> urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5, identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E—Chevron <br /> easement that bisects the project site. <br /> 9: < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> _. any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> c line. <br /> Q. <br /> m <br /> v <br /> $ v <br />