Laserfiche WebLink
Mm <br /> r: o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> g' Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action Completed <br /> a4.2-4 Land Use and Agriculture Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal developer <br /> a The project applicants shall implement the following <br /> co mitigation measure: <br /> < At such time as the interim land disposal of <br /> n <br /> treated wastewater at the Pombo property is <br /> ° discontinued,GNK, LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e., feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD, in <br /> Adjacent Agricultural Operations conjunction with the <br /> a < Before development, the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> n water from the canals by the installation of <br /> o_ pipelines and other means.The filling of the <br /> 3 irrigation canals shall be approved by BBID. <br /> CD <br /> 4.6 CULTURAL RESOURCES <br /> 03 <br /> 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> °3 Destruction/Damage to Undiscovered Cultural conjunction with the <br /> K Resources developer,and in <br /> 3 If discovery of unknown cultural materials is made conjunction with <br /> �• during construction, ground-disturbing activities at qualified <br /> = the construction site where the discovery was made archaeologist,if <br /> C/) N shall be halted. The College Park developers or needed. <br /> m construction contractor shall contact the San Joaquin <br /> N <br /> d County Community Development Department <br /> c_. (SJCCDD) immediately, and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> 0 U notified and retained by the College Park developer. <br /> = The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br /> I I_ I I I I I I I I L <br />