Laserfiche WebLink
r r- r r r r-r r— r r-- r r r! r— r IF r <br /> U) n <br /> � o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 5 5� <br /> o d Implementation Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> = Section 5.2.4:15 of the SJMSCP. These include <br /> u0� retention of tall vegetation,regular discing of the <br /> CD site, or use of chemicals or traps to kill ground <br /> Cn <br /> squirrels; <br /> ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> d <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> 9 <br /> g During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> o' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> n representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> CD <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> v <br /> have not begun egg laying or(2)juveniles <br /> o m from the occupied burrows are foraging <br /> y independently and are capable of <br /> independent survival. After the fledglings <br />