Laserfiche WebLink
Km <br /> = 0 <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action <br /> Completed <br /> nare capable of independent survival, the <br /> burrow can be destroyed. <br /> m <br /> 4.10-6 Biological Resources—Conversion of Common Before and during_ SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> D Active Nests <br /> < The College Park developers shall request <br /> E3 coverage under the SJMSCP, and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park. Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> 0 process, SJCOG will determine whether that <br /> ca specific project site supports suitable nesting <br /> habitat. If SJCOG determines suitable habitat is <br /> n� <br /> R. present on or adjacent to a given project site,the <br /> St SJMSCP incidental take avoidance and <br /> K minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> c, measures below shall be implemented to avoid <br /> x <br /> loss of active nests of common raptor species, <br /> o which are not covered under the SJMSCP but are <br /> mprotected under the California Fish and Game <br /> Code.The project applicants shall retain <br /> M 0 qualified biologists to conduct all pre- <br /> �' c= construction surveys. <br /> o < White-tailed Kite.If project construction begins <br /> w <br /> > >_ during the nesting season(February 15– <br /> September <br /> 5–September 15),pre-construction surveys shall be <br /> l I I I I I I I <br />