Laserfiche WebLink
F_ r r F-_ r-- r- r" r- r r r- r r- r <br /> C College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&VerificationMitigation Measure Timing/Schedule <br /> °c Responsibility Action Date <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> N standards, the County shall extend the standard of <br /> m LOS D to the segment of Byron Road east of Grant <br /> Line Road. <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e) to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see "Regulatory <br /> Setting,"above). <br /> 94 The latest version of the San Joaquin Valley Air <br /> 5 Pollution Control District(SJVAPCD)control <br /> omeasures are included in the Guidefor Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> o repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> a the SJVAPCD to implement the current version of the <br /> 70 <br /> measures at the time individual development <br /> applications are received by the County for <br /> development under College Park. <br /> -0 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> M Contaminants(TACs) begins and during conjunction with the <br /> 3 g ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />