Laserfiche WebLink
K rn <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> a <br /> ► Mobile-Source TAC Emissions—The College <br /> � Park applicants for industrial or commercial land <br /> fD uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> v methodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> -a Emissions of Criteria Pollutants begins and during conjunction with the <br /> m The College Park developers shall implement all of construction developer <br /> RL <br /> c„ the mitigation measures as recommended in the <br /> Guide for Assessing and Mitigating Air Quality <br /> aImpacts(SJVAPCD 1998).Many of these measures <br /> iv are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> Nmitigation in the MHMP and Delta College EIRs. <br /> CD <br /> o` 07 <br /> W 0 <br /> c n. <br /> n <br /> 0 9 <br /> c <br />