26. Wastewater Treatment Plant: <br /> A Under,the direcilion.of:the MHCSD;_the applicant shall fund,design"and construct a <br /> .,phased,,expansion :of the,wastewater treatment.plant'(VIIWTP)of sufficient capacity, no <br /> less.tha:,'f.5.rhgd, 6serve Tract No 3641;prior:to issuance of the first bur ding'permit. <br /> _. g. o.:. <br /> Recognizing that th6i6irnay be agreements between the develapets for sharing capacity <br /> and also.recognizing;ttiat the MHCSD is riotta party fo:arid has'no control over,such. <br /> agreements, bonding'for construction shall be provided.pnor to approval of the#first final <br /> map and beginning of construction shall be at the discretion ofi the General Manager. <br /> Issuance of:building permits shall cease if cons#ructiondoesFh6t begin when directed by <br /> the General Manager.` <br /> B. The developer shall extend existing pipelines to'the project site as shown`on`ttie Master <br /> Sanitary Sewer Plan. The developer shall also extend the sanitarysewer system _ <br /> pipelines;to the-Grant Line Village frontage road as directed by the General Manager in'' <br /> order to serve the residents of Grant Line Village'ainterim treated wastewater land ` <br /> disposal capacity and piping system to serve the proposed project shall be`provided by <br /> the developer until such time as the river-discharges Commence:;Initiation of State', <br /> Permit Application for land application of the treated discharge requirement shail,parallel <br /> the treatment plant capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A shall�meet <br /> the requirements of the Regional Water Quality.Control Board (RWQCB)effluent <br /> permits including compliance scheduling, testing.and any infrastructure that may be <br /> required for long-term discharge into Old River. Additional treatments`that may be <br /> required by the RWQCB for such pollutants as dissolved solids, metals and heat, <br /> etc., shall be addressed in the plant expansion. The developer shall bond for or fund <br /> construction for the developer's fair share cost prior to the filing of the first Final Map. _ <br /> 27. Water Treatment Plant: Under the direction of the MHCSD,'the applicant shall fund, design <br /> and construct the last phased expansion of the water treatment plant(WTP)to provide thery <br /> capacity required to serve Tract No.3646 prior to Issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity and <br /> also recognizing that the MHCSD is not a party to and has no control over such agreements, <br /> bonding for construction shall be provided prior to approval of the first final map and <br /> beginning of construction shall be at the discretion of the General Manager. Issuance of <br /> building permits shall cease if construction does not begin when directed by the General <br /> Manager. <br /> 28. Other Water System Facilities:Water storage requirements, booster pump station and <br /> looping of the water distribution system pipelines-shall be done in accordance with the Water <br /> Master Plan and as directed by the MHCSD prior to issuance of the first building permit in <br /> SP III. Construction of one tank may be allowed if an engineering analysis shows that the <br /> second tank may be constructed at a later date without adverse impact on the first tank <br /> and/or existing customers of MHCSD. Each phase of SPlil will be reviewed to confirm the <br /> existing"in-place" infrastructure is adequate to provide MHCSD Design Standards. <br /> 29. Construction Emissions: The applicant shall implement the following: Regulation VIU l F <br /> Control Measures of the SJVAPCD and applicable measures in Table 6-3 of the SJVAPCD <br /> Guide for Assessing and Mitigating Air Quality Impacts. Timing: Note on improvement <br /> plans approved by the MHCSD for Tract 3646. <br /> 30. BBID Canal: The.applicant shall reroute the canals as directed by BBID in order to ensure <br /> continued supply of agricultural irrigation water to lands remaining in agricultural use <br /> following construction. Timing: Approval of the rerouting and grading and improvement 1 <br /> plans approved by MHCSD prior to approval of first Final Map. <br /> E <br /> 24 <br /> i <br />