My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006256
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600433
>
SU0006256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 1:55:06 PM
Creation date
9/5/2019 10:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006256
PE
2620
FACILITY_NAME
PA-0600433
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600433\SU0006256\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The developer shall build the required drainage system and water quality basins and <br /> improve the creek as required by MHCSD to accommodate runoff from the project.The <br /> developers shall.expand W061 as required by MHCSD to accommodate-runoff from the <br /> project-before development of those_portions are to be'served by the OeAnza'Boulevard <br /> arid.Mountain House,F'arkway,storm-drain systems. The basin shall be`expanded to a <br /> capacity necessa.yjto serve Tract No.364&.Jhe configuration shall:be as--per ike <br /> Storm Water Master Pian Update. The Water duality'Basi' shall be dedicated to <br /> MHCSD: <br /> "Water Decontaminator-Model WD-:10z18A as manufactured by,lnventive Resources or <br /> approved equal catch basin inserts shall be installed prior to issuance of the first building <br /> permit. The builder shall be responsible for the maintenance and repair of all catch <br /> basin inserts installed within the right-of way until construction is complete <br /> 24. Water Quality BaSins,M'0S uita Abatement Pians for the implementation and <br /> maintenance of the water quality basins and any other storm drainage facilities involving <br /> open bodies of water shall be reviewed and approved by the MHCSD and if required by the <br /> MHCSD,reviewed by.the mosquito Abatement District. Condition shall be met before <br /> approval of first f=inal Map. , <br /> 25. Utilities: <br /> A. The Developers and contractors shall.comply with Ordinance No.4162"Street Opening <br /> and Pavement Restoration Regulations". <br /> B. When any portion of an arterial street is to be included in a development's construction <br /> plans, then all of the buried utilities that are ultimately planned to be within the <br /> improvement area shall be installed as part of the,street improvement project regardless <br /> if any of the utilities are required for any phase of the development associated with the <br /> street construction. Conduits or sleeves may be installed in lieu of the buried utility if <br /> approved by the MHCSD. <br /> C. Any phased development shall install all"in-tract'utilities required to serve it <br /> development. In addition, if any future adjacent or nearby phases of the development, <br /> or adjacent Neighborhoods,will depend on obtaining service from such utilities, then the <br /> utility lines shall be sized to serve these future developments. Any utility lines that are <br /> intended to be used by an adjacent development or Neighborhood shall be installed up <br /> to the phase or Tentative Map boundary line to make it available for future extension. To <br /> recoup all or a portion of any over sizing costs, the developer may request the MHCSD <br /> to process a reimbursement agreement pursuant to the MARA. <br /> D. When public utilities are to be located outside public rights-of-way but within the <br /> Tentative Map boundary, the developer shall provide public utility easements for these <br /> utilities. The easements shall be shown on all Final Maps and parcel maps. <br /> E. Prior to the submittal of improvement plans for the development, the developer shall <br /> submit to the MHCSD composite schematic plans for in tract storm drains, sanitary <br /> sewers, and water distribution facilities. <br /> F. Electrical transformers within residential Neighborhoods shall be in underground vaults, <br /> subject to MHCSD and Modesto Irrigation District(MID) requirements. The developer <br /> shall pay for any incremental costs relating to undergrounding transformers not paid for <br /> by MID. Transformers located in the downtown area, commercial and industrial areas <br /> may be placed above ground provided they are aesthetically designed and/or shielded <br /> by landscaping subject to MHCSD and MID requirements. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.