Laserfiche WebLink
o <br /> cn' D <br /> °'- College Park at Mountain House Specific Plan.III <br /> Mitfgation Monitoring and Reporting Program' <br /> o Implementation&Verification <br /> Implementation <br /> o. Mitigation Measure Timing/Schedule Responsibility Action Date <br /> co Completed <br /> a 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> cD In accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> co construction at the project site, the College Park qualified archaeologist. <br /> a <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed, <br /> SJCCDD• The County shall, in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands.(HSC Section <br /> a, 7050.5[b}). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> determination(HSC Section 7050[c]).Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> civ NAHC, the MLD, in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon, <br /> notification of a discovery of Native American human <br /> o� remains are outlined in detail in the PRC Section <br /> tee' 5097.9. Measures likely resulting from the above. <br /> could include preservation in place and <br /> z capping/avoidance, or removal and continued <br /> monitoring of ground-disturbing activities. <br /> M CD <br /> C__ 4,7 DRAINAGE <br /> - n 4.7-2 Drainage---Result in Flooding or Exceed the Before construction MHCSD,in <br /> 0 Capacity of the Storm-drains System conjunction with the <br /> a :2 The College Park developers shall expand WQ131 as developer <br /> required to accommodate ninoff from the College <br /> Park project,or shall provide the required on-site <br /> 0--n. w aft" W.-mmN irr.A, ,mmlm+ pman.* mm=" l.i...y rMPMMA --t <br />