Laserfiche WebLink
cn C7 <br /> I a <br /> College Park at Mountain House Specific Plan III <br /> � v Mitigation Monitoring and Reporting Program <br /> o ' Implementation Implementation Verification <br /> Mitigation Measure Timing/Schedule <br /> c responsibility Action Date <br /> Completed <br /> retention in-lieu of the required expansion of WQB 1, <br /> before development of those portions of <br /> Neighborhoods B and D to be served by the DeAnza <br /> CD Boulevard and Mountain House Parkway storm-drain <br /> 0 <br /> coo systems. <br /> 4.8 WATER QUALITY <br /> :2 4.8-1 Water Quality—Potential Temporary NCI(s)submitted to MRCS. ,in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB) to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 401 water quality certification, ensure compliance dewatering activities, <br /> with the State Water Resources Control Board water quality <br /> (S WRCB) statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering. begins <br /> �a activity, and obtain any other necessary site-specific <br /> WDRs or waivers issued pursuant to the Porter– <br /> Cologne Act. As required under the NPDES <br /> stormwater permit for general construction activity, <br /> o the project applicant shall prepare a Stormwater <br /> " Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering plans and specifications for <br /> CL pollution prevention and control,The SWPPP and <br /> (D other appropriate plans shall: <br /> < Identify and specify the use of erosion and <br /> sediment control Best Management PracticesLO - <br /> o (BMPs),means of waste disposal, <br /> 0 a implementation of approved local plans,non- <br /> @ > stormwater management controls,permanent _ - <br /> postconstruction BMPs,and inspection and <br />