Laserfiche WebLink
_Zo <br /> College Park at Mountain House Specit3c Plan IIS <br /> Mitigation Monitoring and Reporf ng Program <br /> o Implementation 4 Verification <br /> o. Mitigation Measure Timing/Schedule Implementation <br /> Respansibiiity Action Date <br /> Completed <br /> amaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> during construction that could be present in <br /> �. stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs.are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < identify the types of materials used for <br /> o_ equipment operation; <br /> cn <br /> < Identify measures to prevent or clean up spills of <br /> 0 hazardous materials used for equipment <br /> operation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> S2. subsequent site-development activities; <br /> s <br /> < Identify personnel training requirements and <br /> 0 c procedures that will be used to ensure that <br /> ro workers are aware of permit requirements and <br /> o proper installation and performance inspection <br /> methods for specified BMPs; <br /> ' 5, < Identify the appropriate personnel responsible for <br /> o -v supervisory duties related to implementation of <br /> o� <br /> a the SWPPP; and <br /> < Require all construction contractors to retain a <br /> ,__._.._�,. - .�� ....... r....■,. .,.�..-q ..-� ..r.. ��+.. .....4 M....► r�rrr �a.rY �!� �..w.,� I11��, �uN irw+t <br /> N <br />