Laserfiche WebLink
cn � <br /> a: o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> c� Implementation&Veritacation <br /> c Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> - Completed <br /> employing one of several methods outlinedin <br /> z Section 5.2.4.15 of the SJMS.CP.These include <br /> retention of tall vegetation,regular discing of the <br /> site, or use of chemicals or traps to kill ground <br /> squirrels; <br /> > Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found, the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September I <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation, as <br /> described in the DF'G's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> o During the breeding season(February 1 <br /> through August 31),occupied burrows shall <br /> anot be disturbed and shall be provided with a <br /> p' 250-Foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> v concurrence of the permitting agencies' <br /> a representatives on the Technical Advisory <br /> Committee, ora qualified biologist approved <br /> by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> have not be!gan egg laying or(2)juveniles <br /> m� from the occupied burrows are foraging <br /> independently and are capable of <br /> independent survival, After the fledglings <br />