Laserfiche WebLink
� m <br /> CD <br /> a <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> 2. <br /> Imptementafian <br /> Implementatiori.&:Verification <br /> o Mitigation Measure Timing/Schedule <br /> Responsibility Action Date <br /> coI Completed <br /> are capable of independent survival, the <br /> burrow can be destroyed. <br /> 4.10-6 Biological Resources--Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> -� Active Nests <br /> < The College Park developers shall request, <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> _ throughout much of the College Park site,but are <br /> a' concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> ° process,SICOG will determine whether that <br /> specific project site supports suitable nesting <br /> -D habitat.If SICOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> m SJMSCP incidental take avoidance and <br /> K minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> m measures below shall be implemented to avoid <br /> m <br /> loss of active nests of common raptor species, <br /> Cn which are not covered under the SJMSCP but are <br /> protected under the California Fish and Game <br /> o Code.The project applicants shall retain <br /> CD <br /> c <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> o -0 < White-tailed Kite. If project construction begins <br /> v <br /> during the nesting season(February 15— <br /> September 15),pre-construction surveys shall be <br /> .�..- �� ....... ...-... ...� eir+*r` -Ai— PMM" Imo++ &NORMA A—IA, PO-0" PON"" 000"� <br />