Laserfiche WebLink
M <br /> ' a <br /> o .College Park at Mountain House Specific-Plan III <br /> Mitigation Monitoring and Reporting Program <br /> n' Mitigation Measure Timing/Schedule <br /> Implementation Implementation&Verificallon <br /> �. Responsibility Action Date <br /> Completed <br /> nduring the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> �n activity. The survey shall be conducted within <br /> 'D the 2 weeks before construction or tree removal <br /> 0 <br /> begins.If any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources---Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> e, under the SJMSCP, and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> v Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> ro California horsed lark,or tricolored blackbird.If <br /> o` SJCOG determines suitable habitat is present on or <br /> Q adjacent to a given project site,the following <br /> G. H SJMSCP incidental take avoidance and minimization 4 <br /> 0 70 measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />