Laserfiche WebLink
cn n <br /> n� o <br /> CD College Park at Mountain House Specific Plan M <br /> Mitigation.Monitoring and Reporting Program <br /> 0 w Implernentation.&:Verification <br /> °c Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> w <br /> Completed <br /> conducted to investigate all potential nesting <br /> o trees on the project site(e.g.,especially tree-tops <br /> y 15-59 feet above the ground in oak,willow, <br /> m eucalyptus, cottonwood, or other deciduous <br /> CO <br /> trees), whenever white-tailed kites are noted on- <br /> CD <br /> site or within the vicinity of the site during the <br /> n nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shaII be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15--August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within.500 feet of areas of project <br /> o activity. The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> setback of 500 feet from northern harrier nesting <br /> v <br /> areas shall be established and maintained during <br /> a the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> CD <br /> leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the - <br /> opresence of nests that are known to be occupied. <br /> CD Setbacks shall be marked by brightly colored <br /> 3 temporary fencing. <br /> < Common Raptors.If project construction begins <br />