Laserfiche WebLink
cn n <br /> m o <br /> o <br /> mCD College Park at Mountain House Specific Plan III, <br /> . Mitigation Monitoring and ReportingProgram <br /> aImplementation Implementation&ve�ifreatipn' <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> Action Completed <br /> below; <br /> Special-Status Plants Before construction SJCOG,in <br /> < Before any ground-disturbing or vegetation- consultation with <br /> CD <br /> clearing activities; a qualified botanist shall USFWS and DFG <br /> C conduct surveys for the special-status plant <br /> species identified in Table 4.I 1-I of the EIR. <br /> Surveys shall be conducted at the appropriate <br /> time, when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed.If no special- <br /> status plants are found,no further mitigation <br /> shall be required. <br /> • If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> m If special-status plant populations cannot be <br /> 0 avoided,consultations with DFG and/or <br /> USFWS may be required,depending on the <br /> D. listing status of the species present.These <br /> o consultations shall determine appropriate <br /> mitigation measures for any populations that <br /> would be affected by the implementation of <br /> c'- the proposed project.Appropriate measures <br /> may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations,or restoration or <br /> M creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction STCOG,in <br />