Laserfiche WebLink
E: m <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Ptogram <br /> Implementation <br /> Implementation&Verification <br /> o: Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> oGrant Line Road has.potential to adversely affect <br /> a California red-legged frog.It may be necessary <br /> cn to conduct a formal habitat assessment and <br /> osurveys to make such a deternoination.If it is <br /> determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons,minimizing <br /> ro vegetation removal and in-water construction <br /> m activities, conducting pre-construction surveys, <br /> RL and conducting daily.surveys and monitoring of <br /> construction areas, If necessary,appropriate <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> a' <br /> z habitat and creation of additional habitat. <br /> c Before construction SJCOG;in, <br /> � @ Swainson's Hawk . <br /> C_ cn < If project construction begins during the (surveys shall be consultation with DFG <br /> p Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> DFG (March 1 to September 15),pre-construction prior to construction <br /> o -0 surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> P.-rOlk so-a" W . rNEWw4 rmm" MMrA ..NNam"M PWWW1 pmmnd� <br />