Laserfiche WebLink
� n <br /> a� o <br /> w ID College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation.&�Ved ication <br /> Mitigation Measure Timing/Schedule p <br /> c Responsibility Action Date <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> N standards,the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east of Grant <br /> Line Road. <br /> CD <br /> Because Byron Road is a major regional arterial <br /> ri serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Syron Road east of Grant Line Road, <br /> 4.12. AIR QUALITY <br /> 4..12-1 Air Quality—Generation of Temporary,Short- Before constructionSJVAP-D,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> o measures are included in the Guide for assessing and <br /> Mitigadng.4ir Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> a the SJVAPCD to implement the current version of the <br /> Cmeasures at the time individual development <br /> applications are received by the County for <br /> development under College Park. <br /> -0 4.12-2 Air Quality---Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> Q Contaminants(TACs) begins and during conjunction with the <br /> ► . Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1.. <br />