Laserfiche WebLink
� m <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o implementation&Venfication' <br /> o' <br /> Mitigation Measure Timin /Schedule Implementation <br /> 9 9 Date <br /> Responsibility Action Campfeted <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial Iand <br /> uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> 0 methodologies that may become available to <br /> estimate the risk. The developers shall implement <br /> any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> ti The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> u 4.12.5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> -o Emissions of Criteria Pollutants begins and during conjunction with-the <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> w are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> m mitigation in the MHMP and Delta College EIRs. <br /> CD <br /> C_ C/) <br /> o � <br /> � A <br /> G <br /> 7 C] <br /> n � <br /> O pj <br /> C <br />