Laserfiche WebLink
00 <br /> � o . <br /> College Park at Mountain House Specific Plan III <br /> °. Mitigation Monitoring and Reporting Program <br /> ° �" Im fementation implementation&UerifTcation <br /> C o Mitigation Measure TiminglSchedule Lp <br /> Responsibility ActionDate <br /> _• 4.13. NOISE <br /> Compieted <br /> = 4.13-1 Noise—Generation of Temporary Construction During constructionSJCCDD,in <br /> 0 <br /> Noise conjunction with the <br /> < Limit project construction activities to the hours developer <br /> between 6:00 a.m. and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. _ <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> installed around stationary equipment,if <br /> necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD, in <br /> Noise and during conjunction with the. <br /> The project applicants shall incorporate the measures construction developer <br /> identified below into the project design. <br /> a Commercial, Office,and Industrial Uses <br /> C <br /> CD Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> v exceedance of 55 dBA L.4 during daytime hours <br /> o (7:00 a,m. to 10;00 p.m.)or 50 dBA L.,during <br /> > nighttime hours(10:00 p.m to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />