Laserfiche WebLink
F <br /> F <br /> MITIGAU6N MONITORING AND.REPORTING PROGRAM <br /> Fi INTRODUCTION <br /> F, In accordance with the California Eny ronmental Quality Act{CEQA),San Joa uin Coun <br /> Gerry N.Kamilos,LT.CGNK LLC q ty(County) and <br /> ),prepared an pnvit6nmetital impact report IR. Haat identifies <br /> adverse impacts related to the College Park at Molkain House Specific Plan III Project.The ETR also <br /> ideritifes mttigatiort measures that would reduce or eliminate these impacts. <br /> Section 21081:6 of the.California Public Resources Code§I5091{d}aired 15097 of the State CEQA <br /> Guidelines require public agenncies"to adopt a.reporting and monitoring program for changes to the <br /> Project which it has adopted or made:a coti.dition of.project apptoyal in ordei to mit' <br /> significant effects on the environment"A Mitigation Monitoring.and Re agate or avoid <br /> required for the College park at Mountain.House Specific Plan III Project ecause to EIR fogram or the project <br /> identified potentially significant adverse impacts related to.construction and implementation ac ' <br /> and mitigation measures have been identified.to mitigate those impacts. p tivrties, <br /> t Adoption of the MMRP will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> f + This MMRP has been prepared to ensure that all required q ed mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary, in response to changing conditions or other refinements.A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation timing,responsible person/agency for implementing the measure, monitoring and <br /> Fil reporting procedure,and space to confirm implementation of the mitigation measures.The numberin f <br /> mitigation measures follows the numbering.sequence found in the EIR. g o <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> i demonstrating that the action has been successfully completed. San Joaquin County, <br /> delegate implementation responsibility or portions thereof to the developer(GN ,,LLC), a licensed? may <br /> F1 <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> F1County staff members, and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate <br /> uin <br /> County staff, check plans,reports,and other documents required by the MMRPaneonductreport <br /> activities. <br /> F! < Serve as a liaison between San Joaquin County, the Mountain House Co <br /> mmunity(MHCSD), and the construction contractor regarding mitigation monitoring iss es.cruises District <br /> € ' < Complete forms and maintain reports and other records and documents generated by the MMRP. <br /> College Paris at Mountain House Specific Pian lfl EQAW <br /> San Joaquin County 1 Mitigation Monitoring and Deporting program <br />