Laserfiche WebLink
< .Coordinate and ensure that corrective actions or enforcement measures are taken;if necessary. <br /> The responsible party for.each item of implementation will identify the staff members responsible for, <br /> coordinating with San Joaquin County on.the MMRP. <br /> ANNUAIL REPORTING <br /> Sari Joaquin:County shall-prepare an annual monitoring report until completion oftlie--project on the <br /> compliance of the activity with the required mitigation.measures.Information regarding periodic <br /> .inspections and other requirements shall be compiled and explained in the annual reportThe report shall <br /> be designed to simply and clearly identify whether mitigation measures are being,or have been, <br /> adequately implemented.At a minimum,each report shall identify the mitigation measures or conditions <br /> to bemonitored for implementation,whether compliance with the mitigation nieasiires.or conditions has <br /> occurred, the procedures used to assess compliance, and whether further action is required. <br /> MXTIGATION MONITORING AND REPORTING.TABLE <br /> The annual report submitted will verify the implementation of mitigation measures. The MMRP Table <br /> that follows should guide San Joaquin County in their evaluation and should be the basis for annual <br /> reporting. <br /> The column categories identified in the MMRP Table are described below. <br /> Mitigation Number—This column lists the mitigation measures according to the number in the EIR. <br /> Mitigation Measure—This column provides the text of the mitigation measures identified in the EIR. <br /> Timing/Schedule—This column lists the time frame in which the mitigation will take place. <br /> Implementation Responsibility--This column identifies the entity responsible for complying with the <br /> requirements of the mitigation measure.In most cases,the construction contractor will be responsible for <br /> conforming with the mitigation measure. <br /> Implementation and Verification—These columns are for verifying compliance_The"Action"column. <br /> describes the type of action taken to verify implementation_The"Date Completed"column is to be dated <br /> and initialed by the project manager, or his/her designee,based on the documentation provided by the <br /> construction contractor,its agents(qualified individuals),or through personal verification by San Joaquin <br /> County. <br /> EDAW College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program 2 San Joaquin County <br />