Laserfiche WebLink
Cn 0 <br /> a� o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program. <br /> Imp lementation&Verification <br /> Mitigation Measure <br /> :Tim <br /> inglSchedule <br /> Implementation Date <br /> o Responsibility Action <br /> �c Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> Land Uses construction,and Community <br /> vs The College Park developers shall implement the During design phase Development <br /> CD <br /> following measures, Department <br /> 0. <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled.The fencing shall be suffcienfto block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&ErChevron <br /> o easement that bisects the project site. <br /> o < Identify an agrriculturaI buffer of no less than 100 <br /> 0 feet at the time of Tentative Map approval for <br /> a. any new units in the residential area in and south <br /> of Grant bine Village and adjacent to the County <br /> m line. <br /> CL <br /> m <br /> rn <br /> Ca <br /> C <br />