Laserfiche WebLink
K o <br /> a <br /> o, College Park at Mountain'House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> ' Implementation Implementation Verification <br /> o Mitigation Measure Timing/Schedule . . ResponsibilityDate <br /> Action <br /> Completed <br /> CL maintenance responsibilities; <br /> M < Specify the pollutants that are likely to be used <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> cc discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> cc measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> ro < Identify measures to prevent or clean up spills of <br /> hazardous materials used for equipment <br /> operation and hazardous waste; <br /> 9 < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> subsequent site-development activities; <br /> < Identify P S personnel training requirements and <br /> cr, <br /> a <br /> procedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> 0-0 proper installation and performance inspection <br /> G n. methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> o supervisory duties related to implementation of <br /> the SWPPP;and <br /> ` — < Require all construction contractors to retain a <br /> UN I= I= am IM LW M an EM lei <br />