Laserfiche WebLink
va College Park at Mountain Douse Specific Plan III <br /> CD <br /> Mitigation Monitoring and Reporting Program. <br /> Implementation <br /> implementation&Verification <br /> c Mitigation Measure Timing/Schedule Responsibility Action Comaleted <br /> p <br /> copy of the approved SWPPP on the construction <br /> y site. <br /> ° <br /> en 4.9 PUBLIC HEALTH AND SAFETY <br /> cn 4.9-1 Public Health and Safety—Possible Exposure to Before and during San Joaquin County <br /> Pre-Existing Hazardous Materials During construction; Environmental Health <br /> n Construction Before demolition, Department and the <br /> The College Park developers shall implement the renovation,or Central Valley <br /> following measures: modification of RWQCB,in <br /> < Project grading,excavation,and other earth- structures conjunction with the <br /> moving activities at the project site and off-site developer and a <br /> infrastructure locations shall be monitored at the qualified hazardous <br /> County's discretion by qualified hazardous materials expert <br /> materials experts(either qualified County staff or <br /> consultants)for signs of potential pesticide, <br /> hydrocarbon,or other contamination,If the <br /> County or consultants observe soil discoloration, <br /> noxious odors,or other signs of potential <br /> contamination,Phase 11 testing(excavation, <br /> v laboratory testing of soil,possibly groundwater <br /> testing)shalt be undertaken,and any <br /> recommendations made by the consultants shall <br /> � be implemented. <br /> o < The San Joaquin County Environmental Health <br /> Department shall have regulatory authority over <br /> the investigation and clean-up of contamination <br /> ° from underground storage tank releases and would <br /> m <br /> ° provide"no further action required" <br /> ° determinations for that source of contamination. <br /> All aboveground storage tanks(ASTs)and <br /> underground storage tanks(USTs)at the project <br /> p site shall be removed under the supervision of a <br /> 3 > qualified hazardous material expert in accordance <br /> withapplicable regulations and removal permit <br />