Laserfiche WebLink
! ��. �"`��. .�� J. w-�..j .., """"� 1}......-1 ,e.�...,1 �� t..,._..�i :..,,.J ,.,...�.,1 i,.,.�.� �e-._.,.J •�..J I,�.�,..J l;��.�1� <br /> U7 (7 <br /> � p <br /> � cD <br /> CD College Park at Mountain House Specific Platt III <br /> Mitigation Monitoring and Reporting Program <br /> 0w lmplemenfation.&;Verification <br /> o -- Implementation <br /> a _g: Mitigation Measure Timing/Schedule <br /> c °c y Action <br /> Responsibility D"ate <br /> Completed <br /> 3• conducted to investigate all potential nesting <br /> o trees on the project site(e.g.,especially tree-tops <br /> N 15-59 feet above the ground in oak,willow, <br /> f° eucalyptus,cottonwood,or other deciduous <br /> CO <br /> trees),whenever white-tailed kites are noted on- <br /> site or within the vicinity of the site during the <br /> 0 nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shall be establishedand <br /> maintained during the nesting season for the <br /> period encompassing nest building and. <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15 August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity. The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> Z3• setback of 500 feet from northern harrier nesting <br /> areas shalt be established and maintained during <br /> v <br /> the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> CD <br /> o leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> presence of nests that are known to be occupied. <br /> ca <br /> Setbacks shall be.marked by brightly colored <br /> 3 temporary fencing. <br /> < Common Raptors.If project construction begins <br />