Laserfiche WebLink
K m <br /> ;: 0 <br /> College Park at Mountain House Specific Plan W <br /> Z3 Mitigation Monitoring and.Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation Date. <br /> Responsibility Action Co <br /> mpEeted <br /> w <br /> CL during the nesting season(February 15—August <br /> @ 31),pre-construction surveys shall be conducted <br /> -$ during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> ca activity,The survey shall be conducted within <br /> 0 <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> v <br /> B 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources--Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> m The College Park developers shall request coverage prior to,construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> c and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> WCalifornia horned lark,or tricolored blackbird.If <br /> o SJCOG determines suitable habitat is present on or <br /> madjacent to a given project site, the following <br /> • n SJMSCP incidental take avoidance and minimization <br /> n measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> -� = < Loggerhead Shrike.If project construction <br />