Laserfiche WebLink
College Park at Mountain House Specific Plan III. <br /> Mitigation Monitoring and Reporting Program <br /> n Implementation&Verification, <br /> c Mitigation Measure Timing/Schedule Implementation <br /> a ResponsibilityAction Date <br /> Completed <br /> begins during the nesting season(April 1—August <br /> 0 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> ro habitat within 100 feet of areas of project <br /> activity. The survey shall be conducted within <br /> CD <br /> �— the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> vshrike nesting areas shall be established and <br /> _ maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins.during <br /> �- the nesting season(April 1-August 31),pre- <br /> construction surveys shall be conducted during <br /> o' <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity.A <br /> —�� setback of 500 feet from California horned lark <br /> and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> v <br /> a season for the period encompassing nest building <br /> and continuing until fledglings leave nests.This <br /> CD <br /> o setback applies whenever construction or other <br /> �. ground-disturbing activities must begin during <br /> CQ the nesting season in the presence of nests that <br /> om are known to be occupied. Setbacks shall be <br /> 3 marked by brightIy colored temporary fencing. <br /> 4.10-9 Biological Resources--Conversion of San Joaquin Before construction SICOQ in <br />