Laserfiche WebLink
k <br /> w <br /> REGULATION Vlll 2002 <br /> Rules effective May 15, 2002 <br /> i Rule Description VDE Stable <br /> Surface <br /> 8011 General Requirements. <br /> i Includes definitions,general exemptions,test methods for visible emission evaluations and <br /> stabilization evaluations and recordkeeping requirements. NIA NIA <br /> Major exemptions. Emergency responses and operations to restore essential public services. <br /> General requirements. Dust control materials must meet other agency standards and not violate <br /> district rules <br /> Record keeping. Keep retards each day controls are applied. Include type of control, location, <br /> extent of coverage, date, amount and frequency of application. Product information sheets. Retain <br /> records for one year following project completion <br /> FPMP. Fugitive PM10 Management Plans are an option to VDE for 8061,8071 and 8081 sources <br /> to control unpaved roads and traffic areas on days with 75 or more trips. <br /> Test Methods. <br /> Sectionl. Unpaved Roads and Unpaved Traffic Areas. Opacity Test Method. Readings 1 <br /> meter above surface. Two readings per vehicle: zero seconds and 5 seconds. Observe 6 vehicles <br /> within 1 hour. <br /> Section 2. Opacity,Time Averaged. Readings at 15-second intervals: make 12 or 24 readings. <br /> Readings may be interrupted and still considered consecutive, if for example the source moves <br /> outside the range of observation <br /> Section 3. Stabilization. <br /> Visible Crust Determination. Steel ball drop test. 3 drops per square foot;test 3 areas per site. <br /> Silt content for Unpaved Roads and Vehicle Traffic Areas. Sieve test. Obtain V xl' shallow <br /> sample. Weigh sample. Sieve sample aggressively. Weigh fine material in bottom pan. Calculate. <br /> Threshold Friction Velocity. Use sieve test: sieve gently. Measure volume of largest catch. <br /> Compare to TFV chart. Test includes corrections for non-erodable elements <br /> Flat Vegetative Cover. Line transect method. 100-foot measure. Use 3132" pointer for coverage <br /> at each foot. Express result as simple percentage. 50%coverage=stabilized. <br /> Standing Vegetative Cover. Involves height and width of dense vegetation, numbers of <br /> vegetation, and the application of formulas to calculate percent coverage. <br /> Vegetative density. Involves gridline point counting,then formulas to arrive at frontal silhouette. <br /> Rock Test Method. Survey sample areas for numbers and sizes of non-erodable elements. 10% _ <br /> stabilized. <br /> 8021 Construction, Excavation, etc.- <br /> Exemptions. Blasting, maintenance of existing buildings additions to single family dwellings, <br /> mowing/disking weeds on sites less than 1/2 acre,and landfill daily cover. <br /> Requirements. <br /> Demolition. Wet building exterior,surrounding area. Demo debris;comply w18031(Bulk materials) X <br /> Trackout from demolition sites;comply with 8041. <br /> Earthmoving. Prewater. Phase work to limit disturbed surfaces. During active work,apply water X X <br /> or suppressants;or use wind fences, meet VDE. Roads must be stabilized and meet VDE. <br /> Stabilize non-road areas during off hours/days. <br /> Dust Control Plan. Required for any site with 40 acres disturbed or at which 2,500 yards is moved <br /> 3 days in one year. <br /> 8031 Bulk Materials <br /> Applies to materials with silt content above 5%, to sites with 100 cumulative cubic yards(+). <br /> Exemptions. Material damaged by water AND not controllable by other methods. Material <br /> transport 12 feet or less in a conveyer, Agricultural sources(see 8081)and landfill cover. <br /> Requirements X <br /> Handling, Apply suppressants,control VDE X <br /> Storage. Stabilize or cover and anchor,or construct wind fences and apply water/suppressants. X X <br /> On-site Transport. Limit vehicle speed, use 6"freeboard,or wet to meet VDE, or cover load. X <br /> Off-site Transport. Clean empty vehicles, prevent'spillag e/holes/leaks use 6"freeboard and wet to X <br /> meet VDE,or cover load. <br /> Transport via chute. Enclose chute/conveyer,operate sprays or wash material to remove PM10 X <br />