Laserfiche WebLink
Mr.Borges reviewed the Environmental Health Department requirements. <br /> Ms. Mueller informed Mr. Lucas that the Planning Commission hearing is scheduled for December 5, <br /> 2002. <br /> 10:00 a.m. 2. SITE APPROVAL APPLICATION NO.PA-0200465 OF HARVEY <br /> JR BERNDT (C/O MONTE SEIBEL). A Site Approval application for a private <br /> right-of-way for six lots in an antiquated subdivision. Located on the south side <br /> of State Route 12, 2300 feet west of Tretheway Road, east of Lodi (APN: 051- <br /> 140-01; Address: 10550 E. State Route 12, Lodi). <br /> Jose Rubianes,Associate Planner; Richard Stellmacher, Stellmacher Construction; and Monte Seibel, <br /> were present for this item. <br /> Mr. Rubianes introduced the project. Mr. Rubianes informed the applicants that he enclosed a letter from <br /> Selma D. Heagarty's attorney regarding drainage. Mr. Rubianes indicated that the neighbor's concerns <br /> regarding the drainage will be addressed in the Community Development Department's conditions. <br /> Mr. Seibel questioned the Improvement Plan process. <br /> Mr. Borges informed the applicants that each one of the parcels will need a percolation test. <br /> Mr. Karam asked the applicants to show the grades on the revised plan. <br /> Mr. Stellmacker asked if there was any problem with him installing a gate. Mr. Van Buren indicated that <br /> the gate must be see-through and 16'(sixteen)from edge of pavement or 10 `(ten) from property line. <br /> Mr. Borges reviewed the Environmental Health Department requirements. <br /> 10:30 a.m. 3. QUARRY EXCAVATION APPLICATION NO.PA-0200377 OF <br /> JJ RICHARD ROSE (C/O GRANITE CONSTRUCTION). A Quarry <br /> Excavation application to remove 3,400,000 cubic yards of sand and gravel over <br /> four-years(approximately 850,000 cubic yards per year). The excavated material <br /> will be transported off-site for processing. Located on the west side of South <br /> Tracy Boulevard, 600 feet north of the I-580 Interchange between the California <br /> Aqueduct and Interstate 580,Tracy(APN: 253-090-10; Address: 32003 South <br /> Tracy Boulevard). <br /> Jennifer Jolley, Associate Planner; Hop Essick,Deb Keeland and Danny Deveraux; Granite Construction, <br /> were present for this item. <br /> Ms. Jolley introduced the project. <br /> Ms. Keeland made a correction regarding item 1.a.of the Community Development memo,QX 99-1 <br /> should be QX-89-1. Correction was noted. <br /> Mr. Deveraux indicated that in regards to the Department of Public Works memo item 10. he did not <br /> think that there are impacts. Mr. Karam explained how"Fair Share"fees apply towards future <br /> improvements at this intersection. <br />