Laserfiche WebLink
• Details and results of the percolation tests are summarized in the following table. <br /> Table 2. Percolation Test Summary <br /> Test No., Percolation Percolation Test Duration Comments <br /> Date Tested Test Rate (see notes) <br /> Depth (ft.) (minutes/inch) <br /> P1 (Parcel 1) Satisfactory <br /> 6/6/16 3.40 35.7 4 hr. perc. rate <br /> Shallow Test <br /> P2 (Parcel 2) Satisfactory <br /> 6/6/16 3.30 6.9� 4 hr. i <br /> Shallow Test %" perc. rate <br /> P2 (Parcel 2) <br /> 6/6116 . 14.50 <1.$/ 4 hr. Satisfactory <br /> —Deep Test pert . rate <br /> Note: A satisfactory percolation rate for a "shallow'test is less than or equal to 60 minutes per inch. <br /> Discussion of Percolation Test Results <br /> • The soils within the percolation test areas have demonstrated satisfactory percolation <br /> rates for the use of septic systems utilizing leach lines and seepage pits in accordance <br /> with the requirements of the San Joaquin County Environmental Health Department. <br /> Discussion of Septic System Sizing <br /> No new construction is planned for the Site. Any future septic system construction <br /> should follow the San Joaquin County On-Site Wastewater Disposal Standards (2003) <br /> where applicable. <br /> • <br /> LOGE 1608 Page 6 <br />