My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002399
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GUERNSEY
>
3250
>
2600 - Land Use Program
>
UP-90-07
>
SU0002399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:13 AM
Creation date
9/5/2019 10:52:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002399
PE
2626
FACILITY_NAME
UP-90-07
STREET_NUMBER
3250
STREET_NAME
GUERNSEY
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
3250 GUERNSEY
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\APPL.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\CDD OK.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\EH COND.PDF \MIGRATIONS\G\GUERNSEY\3250\UP-90-07\SU0002399\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UP-90-7 <br /> C) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amounts of dust . <br /> D) The area disturbed by clearing , earth moving or <br /> excavation activities should be minimized at all times . <br /> E ) Instead of disking for weed control , the developer <br /> should mow, thereby leaving the ground undisturbed and <br /> with a mulch covering . <br /> After clearing , grading, earth moving, or excavation <br /> operations , during construction j)hase fugitive dust should <br /> be controlled using the following methods : <br /> A) All inactive portions of the construction site <br /> should be seeded and watered until grass growth is <br /> evident . <br /> B) All active portions of the site shall be <br /> sufficiently watered to prevent excessive amounts of dust. <br /> At all times, fugitive dust emissions should be controlled <br /> using the following procedures : <br /> A) On-site vehicle speed shall be limited to 15 mph . <br /> B) All areas with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions . <br /> C) Use of petroleum-based dust palliative shall meet <br /> the road oil requirements of San Joaquin County Rule <br /> 409 . 5 , Cutback Asphalt Paving Materials . <br /> D) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have accumulated <br /> from construction activities . <br /> At all times , ozone precursor emissions should be <br /> controlled using the following methods : <br /> A) Equipment engines should be maintained in good <br /> condition and in proper tune as per manufacturer' s <br /> specifications. <br /> B) During the smog season (May through October) , the <br /> construction period should be lengthened so as to minimize <br /> the number of vehicles and equipment operating at the same <br /> time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.