Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-94-56 <br /> 2 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. (The fee currently is $761 per 1, 000 gross square <br /> foot of building as Manufacturing in the Stockton area. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167 and R-94-174) <br /> 3 . The Water Supply Facilities Impact Mitigation Fee will be required for <br /> this development . The fee is due and payable prior to issuance of the <br /> building permit . The fee currently is $116 per 1, 000 gross square <br /> foot of building as Manufacturing. The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate <br /> of 7 . 66 percent . <br /> (Development Title Section 9-818 .4 and Resolution R-91-327) <br /> TMI :RH: lt <br /> n-ssou.c <br /> c: Manuel Lopez, Deputy Director/Development <br />