Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-72 (REVISION) <br /> 4. 3- The frontage improvements for Harlan Road across the developed portion shall be <br /> constructed in conformance with the standards for one-half of a 60-foot right-of-way <br /> local commercial street. The construction of the frontage improvements will be <br /> deferred upon execution by the owner of a Deferred Frontage and Roadway <br /> Improvement Agreement or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated construction costs prior <br /> to approval of the Improvement Plan. A $260.00 fee currently is required for <br /> processing per Development Title Table 9-240.2 in addition to a copy of the Grant <br /> Deed and an estimate for the required frontage improvements. The estimate shall be <br /> prepared by a Registered Civil Engineer with a typical section drawing on a form to <br /> be supplied by the Department of Public Works and submitted to the Department of <br /> Public Works for approval. As an option, the Department of Public Works will <br /> prepare the drawing and estimate for an additional fee of $115.00. <br /> (Development Title Section 9-1150.2) <br /> 5. 4-. The Traffic Impact Mitigation Fee will be required for this development. The fee <br /> is due and payable at the time of Final Site Plan approval. (The fee currently is <br /> $160.04 per daily trip-end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) A credit may be allowed for <br /> the previous use if it can be verified that it was in operation since April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> f -5-. A copy of the Final Site Plan shall be submitted. <br /> 6 <br /> for the following.- <br /> W Segment of Roth Road fion, its Yvest e id to ikhpoit War. <br /> TT Roth 1\UtlU <br /> C. Entrance to the pioject site. Sttid� the need k5, aecrIeration and decele,ation <br /> The develtpe, shall deposit Funds -9vith the Caunt� for all eosts, as estimated by <br /> �Bevelopnient Title Section 9-115,8-.+ <br /> GK:RH:gn <br /> <-dU-+C' <br /> E: Manuel Lopez, Deputy Director/Development <br />