My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006257
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10998
>
2600 - Land Use Program
>
PA-0600359
>
SU0006257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:15 AM
Creation date
9/5/2019 10:57:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006257
PE
2633
FACILITY_NAME
PA-0600359
STREET_NUMBER
10998
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
APN
19333030
ENTERED_DATE
9/19/2006 12:00:00 AM
SITE_LOCATION
10998 S HARLAN RD
RECEIVED_DATE
9/19/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10998\PA-0600359\SU0006257\APPL.PDF \MIGRATIONS\H\HARLAN\10998\PA-0600359\SU0006257\CDD OK.PDF \MIGRATIONS\H\HARLAN\10998\PA-0600359\SU0006257\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Karla Kuhl <br /> San Joaquin County <br /> Community Development Department <br /> Page 2 <br /> 1. How the I-5 ramps and the Harlan Road/Roth Road intersection should be modified to <br /> accommodate the proposed new use. <br /> 2. Whether sigoalization of the off ramps will be required, <br /> 3. Whether left tum movements or sigualization of Roth/Harlan Roads is required <br /> 4. Whether left tum movements into and out of project should be prohibited- <br /> 5. <br /> rohibited5. All improvements to Roth Road including the intersections with 1-5 Ramps, the Harlan <br /> Road intersection and access to the properties which are under Caltrans jurisdiction must <br /> get approval from Caltrans. The person writing the mitigation must make certain that all <br /> of the required mitigation measure can be implemented,thus approval from Caltrans of <br /> the mitigation measures is important We don't want mitigation measures that can't be <br /> implemented- <br /> 6. <br /> mplemented6. The traffic study needs to address the timing of when the improvements need to occur <br /> and what improvements must be installed prior to operating the proposed new facility. <br /> 7. The traffic study should also state how the improvements are to be funded. <br /> In addition it should be noted that no City utilities are available for this projecL <br /> Please provide me with the dates and times of any future actions regarding this matter. <br /> Sincerely <br /> Marilyn Ponton, Interim Community Development Director <br /> cc_ Pam Carter,City Manager <br /> Cary Keaten, Public Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.