Laserfiche WebLink
� s <br /> t <br /> September 21, 1990 <br /> 5) File for an application for facility permit/waste discharge with the California <br /> Regional Water Control Board for floor drainage system - Central Valley Region <br /> (Environmental Health Division). <br /> G) Submittal and approval for a Construction Pian showing parking for the physically <br /> handicapped, "tow away" sign locations and required slopes. <br /> In addition, compliance with all building codes as per the Uniform Building Code shall <br /> be met as to exterior wall construction, restrooms, and floor drainage of the proposed <br /> shop; please see attachment. <br /> Please be aware that all conditions were to be met befbte 0*permitted use was to be <br /> allowed. You have all ready violated this with the operation of the storage and <br /> maintenance facility out of the existing residence. <br /> In order to satisfy the concerns of the City, please submit all items mentioned above for <br /> the approval of City staff. When all conditions are met,building permits can be issued. <br /> Full operations can proceed when occupancy to the new facility is granted. In the <br /> interim, do not allow parking or driving on existing leach fields for septic systems. In <br /> addition, removal of the existing steel structure adjacent to the residence will be <br /> required. Please contact the City Building Division staff on requirements for this. <br /> If you need additional clarification or have any questions, please contact this office <br /> immediately. <br /> Thank you for your cooperation <br /> Cordially, <br /> Z^Batista IV <br /> Planning Technician <br /> Enclosures <br /> cc: June Rhoades - Building Division <br /> San Joaquin County Public Health Dept. - Environmental Health Division <br />