Laserfiche WebLink
Kerry Sullivan -3- <br /> COMMUNITY DEVELOPMENT <br /> PA-04236(SA) <br /> 8. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of h)tent <br /> (NOl) shall be filed with the State Water Resources Control Board if over one(1)acre of total ground is <br /> disturbed. Additionally,a Storm Water Pollution Prevention Plan (SWPPP) shall be prepared prior to <br /> breaking ground. <br /> 9. On-site truck trailer washing must be drained through a sand/oil separator prior to discharging into the <br /> retention pond. <br /> DTP:DG:ar <br /> P:=MAfEMIS MMR 20W A010026(Mveion).wpd <br />