Laserfiche WebLink
associated with wireless telecommunication shall be removed by the provider of such facilities <br /> and the site restored to its pre-construction state if said facilities have not been operational or <br /> used for a period of six (6) consecutive months. Removal and site restoration shall be completed <br /> within ninety (90) days of the end of said six (6) month period. (Development Title Section 9- <br /> 1065.8) <br /> g. TOWER LIGHTS: For safety purposes, the communications tower shall be lighted according to <br /> the following: <br /> 1) A red light shall be placed at the vertical mid-point of the tower. <br /> 2) The lights shall operate twenty-four hours a day. <br /> 3) The lights shall conform to all lighting standards required by the Federal Aviation <br /> Administration. <br /> h. BUILDING CODE REQUIREMENTS: The following California Building Code and San Joaquin <br /> County Ordinance requirements will be applicable and shall be incorporated in the construction <br /> plans before submittal to the Building Inspection Division: <br /> 1) The Construction Site Plan shall indicate the following: <br /> a) A soils report must accompany Construction Drawings. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209] 468-3000) <br /> a. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolution R-00433) <br /> b The Regional Transportation Impact Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. (Resolution R-06-38) <br /> c. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> d. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> e. The construction phase of the proposed project shall follow best management practices as may <br /> be appropriate to minimize the discharge and transport of pollutants per Title 5-Division 10 (Storm <br /> Water Management and Discharge Control) of the Ordinance Code of San Joaquin County. <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito & Vector <br /> Control District (209-982-4675) and the California Health and Safety Code for the prevention <br /> of mosquitoes. Best Management Practices (BMP) guidelines for stormwater devices, ponds <br /> and wetlands are available. <br /> Conditions of Approval - 2 - PA-1300013 <br />