Laserfiche WebLink
PA-1600105 (SA), S00011690 Page 3 of 3 <br /> V1484 E. Harney Ln., Lodi March 15, 2018 <br /> (EHD) before any UST installation work can begin. Additionally; an EFID permit to operate <br /> the UST is required once the UST system in installed. <br /> H. 1 1,320_gallons or more of petroleum is to be stored aboveground then a Spill Prevention, <br /> Countermeasures ancl Control (SPCC) Plan is required. If any amount of petroleum is to be <br /> stored in a below grade vault, an SPCC plan is required. <br />