My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008578
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000266
>
SU0008578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008578
PE
2611
FACILITY_NAME
PA-1000266
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917004
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1064
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY 5.ENVIRONMENTAL CHECKLIST <br /> 13.PUBLIC SERVICES <br /> l <br /> t <br /> f <br /> Schools <br /> The Mountain House community is located within the boundaries of the <br /> Lammersville Unified School District(LUSD). The LUSD became a unified <br /> school district in July 2011 and was formerly the Lammersville Elementary <br /> School District(LESD). <br /> fElementary Schools <br /> Wicklund Elementary School in Neighborhood F(in the SPI area)opened for the <br /> fall 2004 semester. The school's originally planned capacity was 897 students, <br /> but its capacity is now expected to be less due to restrictions on class size. <br /> Current enrollment is approximately 800 students, and the school is operating at <br /> capacity(Hansen, 2011). <br /> Two K-8 elementary schools—Bethany Elementary and Sebastian Questa <br /> Elementary Schools—were also built for Neighborhoods E and H and are now <br /> F, open for operation. <br /> High Schools <br /> High school students from Mountain House attend Kimball High School in Tracy <br /> approximately 5 miles east of Mountain House. This school is within the Tracy <br /> Unified School District. Currently, about 700 students from the Mountain House <br /> community are attending this school. The school has a total enrollment of <br /> approximately 2,000 students and is not experiencing any capacity problems <br /> (Hansen, 2011). <br /> Students would attend Kimball High School or other schools in the TUSD until <br /> the high school proposed for the south side of Mascot Boulevard within the <br /> Mountain House community is constructed. Plans for this new school have just <br /> Fi recently been approved and will be submitted to the State Department of <br /> Education in December 2011 (.Hansen,2011). The LUSD would determine the <br /> phasing of construction of the high school. The Mountain House Master Plan <br /> 5 states that construction would occur in phases starting when there are 650 high- <br /> school students in Mountain House,with the final phase to be completed when <br /> there are 1,800 students. As noted above, as of July 2011, Mountain House had <br /> FJapproximately 700 high school students(Hansen,2011). <br /> Library Services <br /> ' The Mountain House Master Plan calls for the provision of a public library within <br /> Mountain House to serve the new community. An implementation measure in <br /> SPIT states that Mountain House shall be served by interim leased library <br /> facilities until the population necessitates construction of a permanent full-service <br /> branch library.The timing and scope of the interim facility shall be determined by <br /> the MHCSD to correspond with service need and available operational revenues <br /> and capital improvement funds. <br /> h <br /> (917111) 5-151 <br /> �r <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.