Laserfiche WebLink
MOUNTAIN HOUSE NEIGHBORHOOD8 KAND L INITIAL STUDY 5.ENVIRONMENTAL CHECKLIST <br /> 15. TRANSPORTATIONITRAFFIC <br /> I <br /> fill <br /> Per the SPII approval, Neighborhoods K and L would consist of 1,176 units and <br /> 1,240 units, respectively. In addition,the two neighborhoods were to include <br /> approximately 20 acres of community and neighborhood commercial and 14 <br /> F1acres of mixed use. The two neighborhoods were estimated to support <br /> approximately 1,500 jobs. <br /> The trip generation results are shown in Table 5.15-7. Trips from outside zones <br /> into Neighborhoods K and L zones were computed as inbound trips and the <br /> converse as outbound trips. The projected 2035 cumulative volumes with the <br /> previously approved Neighborhoods K and L traffic are shown in Figure 5.15-3. <br /> Table 5.15-7 TRIP GENERATION FOR APPROVED <br /> NEIGHBORHOODS KAND L PROJECT !I <br /> Inbound Outbound Total <br /> AM 812 1.194 2,006 <br /> Percent 40% 60% 100% <br /> PM 1,536 1,164 2,700 <br /> Percent 57% 43% 100% <br /> Source: TJKM,2011. <br /> Assumed Roadway Improvements. All on-site study roadways are assumed to <br /> be built to accommodate projected traffic. It is anticipated that Great Valley <br /> Parkway,Central Parkway, Mascot Boulevard and Main Street would be <br /> constructed to four lanes(two lanes per direction). <br /> It is assumed that Mountain House Parkway from south of Mascot Boulevard to <br /> Von Sosten Road and Byron Road from south of Central Parkway to Henderson <br /> Road would be constructed to six lanes (three per direction). <br /> Mountain House Parkway from south of Von Sosten Road to the freeway is <br /> assumed to be improved to an eight-lane section. The previously approved lane <br /> configurations for all the study intersections are shown in Figure 5.15-3. The <br /> Pi previously approved improvements are consistent with the 1994 MEIR. <br /> Table 5.15-8 is a summary of adopted transportation improvements differentiated <br /> as follows: improvements included as part of the current Mountain House project, <br /> those initially identified in the 1994 MEIR; and those required for 2035 cumulative <br /> buildout conditions based on the July 2005 analysis which included the <br /> previously approved Neighborhoods K and L project. The following roadways <br /> would be widened to six lanes: Mountain House Parkway from south of Mascot <br /> Boulevard to Von Sosten Road and Byron Road from south of Central Parkway <br /> to Henderson Road. Other measures include widening other portions of <br /> Mountain House Parkway to eight lanes, contributing to a new east-west corridor <br /> parallel to I-205, and contributing to additional road improvements and off-site <br /> (gall 1) 5-177 <br />