My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008578
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000266
>
SU0008578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008578
PE
2611
FACILITY_NAME
PA-1000266
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917004
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1064
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1MOUNTAfN HOUSE NEIGHBORHOODS K AND L INITIAL STUDY 5.ENVIRONMENTAL CHECKLIST <br /> 15. TRANSPORTATIOwjTRAFFIC <br /> bicycle facilities. All improvements are similar to what was identified in the 1994 <br /> MEIR. <br /> As shown in Table 5.15-8, cumulative 2035 conditions would require a number of <br /> improvements that were identified in the 1994 MEIR and that would be required <br /> for ultimate buildout of the new community under Scenario 2. <br /> Level of Service Analysis. The level of service analysis was performed based on <br /> the previously adopted and approved lane configurations as shown in Figure <br /> I 5.15-3. The results of the analysis are shown in Table 5.15-9. The results show <br /> that, under Scenario 2, all intersections for gateway roadways would operate at <br /> l LOS D or better and the remaining study intersections would operate at LOS C <br /> �^ or better. <br /> Based on previously adopted mitigation measures, it is anticipated that Great <br /> Valley Parkway, Central Parkway, Mascot Boulevard,and Main Street ultimately <br /> would be constructed to four lanes. All study intersections would operate at <br /> LOS D or better for gateway intersections and LOS C or better for others. <br /> F!, Scenario 3: 2035 Cumulative Mountain lus Current) Pro osed Nei hborhoods <br /> K and L Project plus Mountain House Buildout Conditions. This scenario <br /> considers the buildout of the cumulative 2035 land uses including all the <br /> neighborhoods in the Mountain House Master Plan and the addition of traffic <br /> from the currently proposed Neighborhoods K and L Tentative Subdivision Map <br /> traffic. <br /> The purpose of this analysis is to determine the traffic impacts due to the <br />{ proposed land use and circulation changes as proposed in the Neighborhoods K <br /> r~ and L Tentative Subdivision Map application. <br /> The proposed Neighborhoods K and L project would contain 2,416 units, similar <br /> to the previously approved SPIT project for these two neighborhoods. In addition, <br /> the two neighborhoods would include approximately 22 acres of community and <br /> i neighborhood commercial uses, and 17 acres of mixed-use. The two neighbor- <br /> hoods are estimated to support approximately 1,564 jobs. That is, compared to <br /> the previously approved project,the proposed project is estimated to add <br /> approximately 190 additional jobs.6 <br /> Assumed Roadway and Circulation Improvements. All on-site study roadways <br /> i F are assumed to be built to accommodate projected traffic. It is anticipated that <br /> Great Valley Parkway,Central Parkway, Mascot Boulevard and Main Street <br /> f^, would be constructed to four lanes(two lanes per direction). <br /> I <br /> �r <br /> e The number of jobs considered in the traffic analysis was 120 more than projected,a <br /> conservative approach. <br /> � i <br /> (W711 1) 5-181 <br /> Fill <br />
The URL can be used to link to this page
Your browser does not support the video tag.