Laserfiche WebLink
GEOLOGY AND SOILS <br /> 28. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.8.3 (1)] <br /> 29. Geotechnical Investigation Recommendations: The applicant shall follow the <br /> recommendations of the following geotechnical investigations: <br /> a. Geotechnical Exploration, Neighborhood K, Mountain House, California, prepared in <br /> September of 2010, by Engeo Incorporated. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps, and the incorporation of all recommendations of the geotechnical <br /> engineering studies into site preparation and construction of each dwelling prior to approval <br /> of building permits. [SP II Implementation Measure 6.8.3 (2); San Joaquin County <br /> Development Title, Chapter 9-905] <br /> HAZARDS <br /> 29. Protocols for Petroleum Hydrocarbons in soil: If indications of petroleum hydrocarbon <br /> contamination in site soil, such as staining and odors, are observed during excavation or <br /> grading activities adjacent to Byron Road, the contractor shall stop work and notify the <br /> Chevron Environmental Management Company and the RWQCB in accordance with the <br /> procedures specified in the Soil and Groundwater Management Plans for Chevron Mountain <br /> House Sites Nos. 1, 2, and 3. The contractor shall ensure that any contaminated soil and <br /> groundwater encountered during project construction is handled in a safe and lawful manner. <br /> 30. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials <br /> including, but not limited to, asbestos shall be carried out in compliance with all applicable <br /> safety standards and coordinated County programs. Applicable standards shall be made part <br /> of the construction specifications for contractors. <br /> Timing: Inclusion of note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.7 (1)] <br /> 31. Environmental Hazards: The applicant shall comply with all recommendations of the <br /> following applicable Environmental Site Assessment Reports prepared by Condor Earth <br /> Technologies, Inc., in 2004 and submitted with the Tentative Maps: <br /> a. Neighborhoods D, K, L, and Town Center Phase I Environmental Site Assessment <br /> Report and A Partial Response to Mountain House Master Plan Chapter Six, Mountain <br /> House, San Joaquin County, California. <br /> b. Limited Phase 11 Environmental Site Assessment Report, Proposed Neighborhoods D, K, <br /> L, and Town Center, Mountain House, San Joaquin County, California. <br /> Timing. Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 32. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating <br /> procedures and safeguards shall be undertaken to insure safety in the area of fuel lines and <br /> pipelines, consistent with the MHCSD Emergency Preparedness Plan (see Emergency <br /> Pipelines Safety Plan). [SPII Implementation Measure 6.8.1 (1)] <br /> 7 <br />