My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008577
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000267
>
SU0008577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008577
PE
2611
FACILITY_NAME
PA-1000267
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917003
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000267\SU0008577\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIOLOGICAL RESOURCES <br /> 33. Participation in HCP: The Tentative Maps shall comply with the San Joaquin County Multi- `r <br /> Species Habitat Conservation and Open Space Plan (SJCMSCP), including all required take <br /> avoidance and pre-construction survey requirements. Alternatively, if the SJCMSCP <br /> terminates, the Tentative Maps may proceed with the implementation of the Mountain House <br /> Habitat Management Plan, contained within the Master Plan Appendix 7-B, pursuant to the <br /> terms of Section 3.11 of the Master Plan Development Agreement between San Joaquin <br /> County and Trimark Communities, LLC. [SPIT Implementation Measure 7.3.1 (1)] <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD) prior to the issuance of grading <br /> permits for the project. <br /> 34. Endangered Species Act: In carrying out the operations of each Tentative Map, the <br /> applicant shall take no action that violates the California Endangered Species Act or the <br /> Federal Endangered Species Act. Compliance with said laws shall be the sole responsibility <br /> of the applicant and the applicant agrees to indemnify, defend and hold the County harmless <br /> from and against any claim or action by affected State agencies, or affected Federal agencies <br /> or other third party, as to the project's compliance with said laws. [SPII Implementation <br /> Measure 7.3.1 (2)] <br /> Timing: Improvement plans prior to Final Maps and ongoing. <br /> 35. Wetland Mitigation. Wetlands mitigation shall provide for the creation of wetlands to replace <br /> those which would be lost, if any. Mitigation, if required by the Clean Water Act, shall occur <br /> within the Mountain House and Dry Creek corridors. [SPII Implementation Measure 7.3.2 (1)] <br /> 36. Buffering. Where preserved wetlands provide valuable habitat to wildlife, protective fencing, j <br /> screening or buffers shall be provided where necessary to minimize disruption of habitat <br /> areas. [SPII Implementation Measure 7.3.2 (2)] <br /> 37. Fencing Requirements. Buffer zones along wetland restoration areas shall be temporarily <br /> fenced during construction so as to minimize the potential for inadvertent impacts from <br /> construction activities. [SPII Implementation Measure 7.3.2 (4)]The applicant shall retain a <br /> qualified biologist or wetlands specialist to stake, using easily-observable flagging, the <br /> boundaries of all wetlands to be protected. The applicant shall organize and convene pre- <br /> construction conferences between the contractor and the project biologist or wetlands <br /> specialist to ensure that grading contractors recognize the importance of these resources and <br /> avoid all flagged areas. <br /> Timing: Improvement plans prior to commencement of grading operations adjacent to <br /> wetlands. <br /> AIR QUALITY <br /> 38. Residential Emissions: Construction plans for residential dwellings shall incorporate the <br /> following items: <br /> • Natural gas lines outlets shall be provided to backyards to encourage usage of natural <br /> gas barbecues. <br /> • 220 volt electrical outlets for recharging electric automobiles shall be provided in each <br /> garage. Electrical outlets shall be located on the outside of single family homes to <br /> accommodate electric lawn maintenance equipment and electric barbecues. .r� <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.